12. Log Progress!

While the fires in Canada had set us back, we are extremely┬ágrateful our cabin wasn't one of the many we heard were destroyed mid-build in other parts. The photo updates we get from Dennis at Jeremiah Johnson Log Homes make all the difference, and we are excited with each email. At this point, everyone is … Continue reading 12. Log Progress!

11. The Foundation

John and his team have been busily pouring the foundation which includes a ton of prep work getting the wood forms in. The final result looks great and we can finally see the cabin shape coming together.  

9. The Excavation

It's been a bit of slow start to get to the point of excavation, if I'm being completely honest. As we all know the housing industry is HOT in Colorado right now. With historically low inventory, more and more people are building, which means subcontractors are busier than ever. John Kennedy, our GC, has been … Continue reading 9. The Excavation

7. The Engineering

Once we decided on the general look of the cabin (pulling from numerous online designs) we communicated our likes and dislikes to Dennis at Jeremiah Johnson Log Homes. He in turn provided hand-drawn plans on grid paper to get the process started. We had a number of revisions during this hand-drawn process and were able … Continue reading 7. The Engineering

4. The Log Furniture

What's a log cabin without rustic log furniture?! Before Becky and I even decided on many of the specifics of our cabin, I knew that I wanted to try my hand at building log furniture. This might be because it required new tools... what guy doesn't like having more tools! ­čÖé I found Lumber Jack … Continue reading 4. The Log Furniture